Subscribe Sign in

Politics

Labor appoints former Liberal leader Sussan Ley to Snowy Hydro board role

1 min read Rewritten in plain language

Politics

Show what we removed Rules applied: A1×2 A3 D1 D2×2 D3×2 F2 all 30 rules
  • A former coalition leader has been appointed by the Labor government to help steer the nation's most expensive and delayed renewable energy project.
  • The government-owned project includes eight power stations and more than a dozen dams, spanning more than 100 kilometres from Thredbo to Tumut in NSW's south.
  • Ley quit politics in February after being deposed by Angus Taylor as opposition leader, ending a 24-year career.
  • Snowy 2.0, in the NSW Kosciuszko National Park, is seven years behind schedule.
  • Ley's previous electorate of Farrer takes in the Murrumbidgee, Murray River and Albury, where many Snowy workers live.

5 sentences from our version of the report, chosen to cover it. Nothing here is written; every line is in the article below. How

Headline check

All three things this headline claims are in the report.

Figures, names and quoted words in the headline, looked for in the report itself — not in the summary above. How this is checked

A former coalition leader has been appointed by the Labor government to help steer the nation's most expensive and delayed renewable energy project.

Sussan Ley will sit on the Snowy Hydro board following her resignation from politics earlier this year, Climate Minister Chris Bowen announced on Monday.

The government-owned project includes eight power stations and more than a dozen dams, spanning more than 100 kilometres from Thredbo to Tumut in NSW's south.

Snowy 2.0 is now being built and will store excess power from wind and solar, intended to become the centrepiece of the project.

Ley quit politics in February after being deposed by Angus Taylor as opposition leader, ending a 24-year career. She then took a reflective road trip around the United States, absorbing the sights of little-travelled areas on Greyhound buses.

Now, it is time for her to begin again — this time by tackling one of the country's projects.

Snowy 2.0, in the NSW Kosciuszko National Park, is seven years behind schedule. Costs have so far ballooned to $12 billion from an initial $2 billion budget and are expected to grow further.

It faced scrutiny for safety issues and executive bonuses despite missing targets.

Ley's previous electorate of Farrer takes in the Murrumbidgee, Murray River and Albury, where many Snowy workers live.

She is being appointed alongside Merryn York, who has worked extensively on engineering technology.

"Their combined knowledge and skill will help Snowy Hydro deliver reliable power, stronger regional economies and more Australian jobs," Bowen said.

The women will replace outgoing board members Sandra Dodds and Scott Mitchell.

It is not the first time a Labor government has appointed a former Liberal politician to a government role. Previous NSW energy minister Matt Kean was named as the chair of the Climate Change Authority in 2024.

You are reading our version, not theirs. This is SBS News's report with its verdicts and loaded words taken out. Plain description stays, and so do adjectives that carry a fact, such as "former" or "federal". The reporting, the facts and the quotations are theirs — quotations are never edited — and the indicators beside it measure this version. Hover or tap Adjectives to see every one left in the text.

How this outlet filed it, and how we rewrote it

No other newsroom we read has filed on this event, so there is nothing to compare it with yet.

Outlet Niral ScoreAdjectivesSourcingSentimentHappiness
SBS Newsas they published this story 13.8 8 10 -0.1 51.7
Mundane Readneutralized from SBS News 10 6 10 -0.1 51.7

Sign in to react.

Comments

Nothing here yet.

Sign in to comment.

Questions

Readers can ask a question about this story here. Questions and answers are for subscribers. Sign in to read them.

Comments are read before they appear where anything in them needs a person to look. Nothing posted here is ever deleted; a comment taken down keeps its text and the reason, so the decision can be looked at again. How this works