The 50-metre pool will be open to the public this summer.
Controversial Geocon project halted: what this means for your summer
Changed after publishing · 1 edit
- the headline was changed:
Controversial Geocon
blocked from Phillip pool works until lease variationproject halted: what this means for your summer
Outlets edit stories after they go out, usually without saying so. We keep what we saw the first time.
From the report
This is a summary. The indicators are not. The scores were measured over this summary alone, which is less of the article than we would like and makes them less certain.
How this outlet filed it, and how we rewrote it
No other newsroom we read has filed on this event, so there is nothing to compare it with yet.
| Outlet | Niral Score |
|---|---|
| The Canberra Timesas they published this story | 4.6 |
How did this read?
Sign in to react.
Comments
Comments are not open yet. They will be once there is someone to read every one before it appears. If something here is wrong, tell us — that we do read.
Report a problem with these scores or this rewrite — it goes straight into the public ledger.